NINGBO XINLE 220 KV MAIN SUBSTATION————STOP WATER LEAKING INTO THE MAIN SUBSTATION

CABLE SEALING HRK AND HRD

The current condition of the outside of Xinle 220kV substation.

The current condition of the inside of Xinle 220kV substation.

Use HRD200 to seal power cables and signal cables, as well as pre-drilled hole.

Use HRD 220/200-SGI-1/98 to seal power cables.

Use HRD 200-SG-3/6-54-4/6-26HRD 220/200-SGI-1/98 to seal power cables and signal cables.

Use HRK150-SSG-1/70-112 to seal power cabes.
Project information and solution provided by AMPdossen
PROJECT INFORMATION
Project time | 2021.05 |
Location | 169 Mujing Road,High-tech Zone, Yinzhou District, Ningbo City, Zhejiang Province |
Owner | State Grid Zhejiang Ningbo Yinzhou Power Supply Bureau |
Installation company | Ningbo Transmission and Substation Construction Co., Ltd. |
SOLUTIONS BY AMPdosse
Specification | Standard cable sealing HRD200 and HRK 150, customized cable sealing HRD200. |
The solution | It is possible to effectively prevent water leakage in the manholes. |
Products used | HRD 200-SGI-1/98 HRD 200-SG-3/6-54-4/6-26 HRK 200-SSG-1/110-162 HRK 150-SSG-1/70-112 HRK150-SSG-3/24-54 HRD 200-SG-7/10-32-8/3.5-16.5 |